- Rail News
- Rly Circulars /Orders
- Promotion / Transfer
- Departmental Exam
- Divisions - Order & News
- Employee News
- Always Important
- Station Master
- G & SR
- Accident Manual
- Operation Manual
- Railway Joke
- Rly Facility
- Interesting Fact
- World Rly
- Education, Job & Career
- Seniority List Retirement Benefit
- Know About Railway
- Rules & Rule Book
- Rly Mannuals & Codes
- Useful Calculator
- Forms- Rly Employee
- YouTube Video - Rly
- Rly Telephone Directory
- Railway Plus
- Rly Question Papers & Bank
- Result
- Rly Study Material
- Operating Dept Guide.
- Establishment Rules
- Financial Rules
- C & W - Guide
- Loco Pilot Guide
- P Way- Guide
- Commercial Dept. Guide
- Rail Management Guide
- Rly Store Guide
- राजभाषा -हिंदी
- First Aid Guide
- Horoscope
- Also Read
Indian Railway Question Bank Smart Search
Indian Railway Question Bank Smart Search
Sort :
Loading...
Go to Page :
Showing posts with label Group 'B' Exam. Show all posts
Showing posts with label Group 'B' Exam. Show all posts
Q & Answer - What are the different types of Engineering surveys under taken before construction of a new line/ Explain their scope and significance.
Q.3.- What are the different types of Engineering surveys under taken before construction of a new line/ Explain their scope and significance.
Ans.- Different types of Engineering surveys –
Reconnaissance Survey -
Rough and rapid survey with or with out instrument of one or more routs for a proposed line is called Reconnaissance Survey. Approximate heights and distances are collected using instruments such as prismatic compass, hand level and range finder.
Previous Q Paper - GROUP "B" LDCE - AEN - 2006, 2007 & 2008
CENTRAL RAILWAY
LIMITED
DEPARTMENTAL COMPETETIVE EXAMINATION
CIVIL
ENGINEERING DEPARTMENT
Date
: 07.01.2006
( Maximum Marks 150 ) Time : 3 hours
PAPER – I – GENERAL KNOWLEDGE & PROFFSSIONAL
Note
: 1) Candidate should clearly write their roll number in words also.
2) Be brief and to the point in your
answers.
3) Score out blank space in answer
sheet.
PART – I - GENERAL
KNOWLEDGE & HINDI POLICY
Note : Attempt any five Questions in Part
I, All questions carry equal
marks.
1. Write the full form of the following
abbreviations. 2 x 5 = 10
Marks.
a) GTKM b) ITKM c) GMT d) ETKM e) NTKM
2. Write the full form of the following
commonly used terms. 2 x 5 = 10 Marks.
a) GPS b) GSM c) MMS d) SMS e) WLL
3. Write the full form of the following
abbreviations. 2 x 5 = 10
Marks.
a) ASEAN b) SAARC c) GATT
d) WTO e) IMF
4. Name of the following :
2 x 5 = 10 Marks.
a)
Chief Minister of West Bengal .
b)
General Manager, North
Eastern Railway.
c)
Vice President of India .
d)
Finance Minister of India .
e)
Member Engineering, Railway
board.
5.
In which State are the following situated - 2
x 5 = 10 Marks.
a) Ajanta . b) Hampi. c) Kaziranga. d) Nalanda e) Sanchi.
6. a) Write all the salient features covered under Section 3(3) of
Official Language Act. 8 Marks.
QUESTION WITH ANSWER - AEN GROUP ‘B’ EXAM 2011
CENTRAL RAILWAY
L.G.S. EXAMINATION – CIVIL ENGINEERING - Date : 23.04.2011
PART
‘A’
Attempt any six
questions of the ten listed below. All questions carry equal four marks. One
mark kept for neatness.
( 6 x 4 = 24 marks
)
Q. 1. - Why is earnest money taken ?
Ans. - Earnest
money –
The Tenderer shall be required to deposit
Earnest money with the tender for the due performance with the stipulation to
keep the offer open till such date as specified in the tender. Earnest money
should be either in cash, deposit receipts, pay orders, demand draft.
The earnest money shall be 2% of estimated
tender value. The earnest money shall be rounded to the nearest Rs. 10/- .
Earnest money shall be applicable for all modes of tendering
QUESTION WITH ANSWER - AEN GROUP ‘B’ EXAM 2003
L.G.S. EXAMINATION
CIVIL ENGINEERING 01 –
02 - 2003
Q.1.- ( a ) What are the two main Grants for engineering
Department and what are detailed heads, sub heads and primary units?
( b ) Mention the
various Budgetary stages for reviews in a financial year?
Ans.- ( a ) There are Two main grants for engineering
Department –
Demand No. 4 – This demand covers
the expenditure on repairs and maintenance of permanent way and work Assets
like track, other buildings and structures.
Primary
units / minor Head -
100 Establishment in offices, 200 Maintenance of Permanent Way. 300 Maintenance
of Bridge work and Tunnels including Road over/under bridges. 400 Maintenance
of service buildings (other than staff Quarters and Welfare buildings). 500
Water supply, Sanitation and Roads (other than Colonies, staff Quarters and Welfare buildings). 600 Other repairs. 700
Special repairs pertaining to Breaches, Accidents etc. including Special
Revenue works. 900 Credits or recoveries.
Previous Q Paper LGS Examination AEN (2003 To 2007)
CENTRAL RAILWAY
L.G.S. EXAMINATION – CIVIL
ENGINEERING
Date :
01.02.2003 (
Maximum Marks 150
) Time
: 3 hours
Note :-
i. Candidates
should clearly write their Roll Number in words.
ii. Attempt
any 2 ( Two ) questions from Part ‘A’.
iii. Attempt
any 2 ( two ) questions from Part ‘B’.
iv. Attempt
Question No. 7 and any other three questions from Part ‘C’.
v. All
Questions carry equal marks except Q.No. 7 as indicated against each.
vi. Answer to
be to the point and brief.
vii. Before
depositing the answer books, blank pages to be crossed by the candidate.
PART ‘A’
Q.1.- ( a
) What are the two main Grants for engineering Department and what are detailed
heads, sub heads and primary units? (
6 )
( b )
Mention the various Budgetary stages for reviews in a financial
year? ( 6 )
Q.2.- ( a
) What are On Account Bill and Final Bill of works and what documents and
certificates are to be attached with
each? (
6 )
Previous Q Paper - GROUP "B" LDCE - ADEN - 2010 & 2012
West Central Railway
Engineering Department
Selection for the post of ADENs Gr. B ( 30%
LDCE Quota ))
Paper – I –
General Professional subject ( Civil
Engineering ), General Knowledge & Rajbhasha
Time :- 3 hours
Max. Marks : 150
Date :- 25 – 04 – 2010
Important Instructions :-
1.
Your name, roll number or
any other mark of identification must not be written in the answer paper.
2.
Answers should be brief
and contents of questions need not be repeated.
3.
Questions No. 8 should be
answered in Rajbhasha only. All other questions may be answered in Hindi or
English.
4.
Max. marks are indicated
against each question.
5.
Answer any five questions
from Part – I and two question from Part II.
6.
In case of any difference
in English & Hindi versions, contents of English version will be treated as
correct.
Previous Q Paper LGS Examination AEN (2008 To 2012)
CENTRAL RAILWAY
L.G.S.
EXAMINATION – CIVIL ENGINEERING
Date
: 19.01.2008
( Maximum Marks 150 ) Time : 3 hours
Instructions
:
i. Candidates have
option to answer either in Hindi or in English. In case of any mistake of
ambiguity in Hindi version. The English version will prevail.
ii. Candidates should
write their Roll Number, in words & numbers, only on fly leaf and should
not write his name / roll number any where else in answer sheet.
iii. This paper contains 3
parts. Attempt all parts.
iv. The blank spaces
between the answers and blank pages at the end should be crossed by the
candidates before depositing the answer scripts.
PART
‘A’
Marks
Q.1.- Write short notes on
any Five of the following - 5 x 5 = 25
marks.
i. Part I & Part II
Audit Reports.
ii. Stock Sheet.
iii. Final Bill.
iv. Non scheduled items.
v. Briefing Notes.
vi. Write Off.
vii.
Variation
statements in Contracts.
PART’B’
Q.2.- Write short notes on
any Five of the following - 5 x 5 = 25
marks.
i. Manor Penalties under
D & AR.
ii. Conduct Rules.
iii. Suspension.
iv. Productivity linked
bonus.
v. Permanent Negotiating
Machinery.
vi. Final Settlement on
superannuation.
vii.
Service
Record.
PART’C’
Q.3.- Write short notes on
any Ten of the following - 10 x 10 = 100
marks.
i. Importance of Water
Cement ratio in concrete.
ii. Various types of
small track machines.
iii. Definition of Distressed Bridge and its rehabilitation.
iv. Different type of
patrollings on track.
v. Official Language
Implementation Committee.
vi. Bridge Bearings.
vii.
Pre
tamping and Post tamping works for tamping machines.
viii.
Steps
to be taken for spreading Hindi Rajbhasha on Indian Railways.
ix. Action required to
increase earnings by Engineering department on the Railway.
x. Working in a Ballast
depot.
xi. Precaution required
to be taken for avoiding buckling of track.
xii.
Actions
to improve TGI value of track.
xiii.
Painting
of girder bridges.
xiv.
License
fee and Way leave charges for Railway land.
xv.
Minimum
essential amenities for passengers on Railway stations.
***************************************
CENTRAL RAILWAY
SUPPLEMENTARY
L.G.S. EXAMINATION – CIVIL ENGINEERING
Date
: 16.02.2008 ( Maximum Marks 150 ) Time : 3 hours
Instructions
:
i. Candidates have
option to answer either in Hindi or in English. In case of any mistake of
ambiguity in Hindi version. The English version will prevail.
ii. Candidates should
write their Roll Number, in words & numbers, only on fly leaf and should
not write his name / roll number any where else in answer sheet.
iii. This paper contains 3
parts. Attempt all parts.
iv. The blank spaces
between the answers and blank pages at the end should be crossed by the
candidates before depositing the answer scripts.
PART
‘A’
Marks
Q.1.- Distinguish between
any Five of the following : 5 x 5 = 25 marks.
i. Earnest money and
Security Deposit.
ii. Final Modification
and Material Modification.
iii. General Conditions of
Contract and Special Conditions of Contract.
iv. Abstract Estimate and
Detailed Estimate.
v. Part I & Part II
Audit Reports.
vi. Special limited
tender and Open tender.
vii.
Preliminary
Works Programme and Pink Book.
PART’B’
Q.2.- Write short notes on
any Five of the following - 5 x 5 = 25
marks.
i. Procedure for creation
of additional posts for additional assets.
ii. Procedure to be adopted for change of classification of
staff from one category to other under HOER Rules.
iii. Distinguish between
dismissal and removal from service.
iv. Workmen Compensation
Act.
v. Hours of Employment
Regulation.
vi. DCRG to a Railway
Servant on superannuation.
vii.
Major
Penalties under D & AR.
PART’C’
Q.3.- Write short notes on
any Ten of the following - 10 x 10 = 100
marks.
i. Design mode operation
of Track Machines.
ii. Procedure of
converting SWR into LWR.
iii. Difference between
Catch Siding and Slip Siding.
iv. Difference between
Temporary Speed restriction and permanent speed restriction.
v. Difference between
hot weather patrolling and cold weather patrolling.
vi. Various types of
protective works to control damage to Bridge approaches by meandering rivers
during high floods.
vii.
Criteria
for manning of Level crossing and procedure to be followed for de manning of
level crossings.
viii.
Precautions
and actions to be taken for safe running of trains in case of rail / weld
fractures.
ix. Precautions and
actions to be taken for safe running trains before and during monsoon at
vulnerable locations.
x. Basic features of a
CSM and Unimate machines.
xi. Different methods of
disinfection of water. What is meant by residual chlorine.
xii.
Difference
between cant deficiency and cant excess.
xiii.
Specifications
of machine crushed ballast and are precautions to be taken while measurement
& passing of ballast.
xiv.
Section
3 ( 3 ) of Official Language Act 1963.
xv.
Various
incentive schemes for encouraging the use of official Language in offices.
**********************************
West
Central Railway
LGS
Examination – Civil Engineering
2008
Maximum
marks : 150 Time : 3 hours.
¦ÉÉMÉ - * ( ®úÉVɦÉɹÉÉ )
+ÊvÉEòkɨÉ
+ÆEò - 15
ºÉ¦ÉÒ |ɶxÉ ¤É®úɤɮú +ÆEò Eäò ½éþ *
|ɶxÉ 1. xÉÒSÉä ÊnùªÉä MɪÉä ¶É¤nùÉå
EòÉ Ê½þxnùÒ +xÉÖ´ÉÉnù Eò®åú *
i.
Perusal.
ii.
Sanction.
iii.
Ex-parte.
iv.
Estimate.
v.
Supplementary.
vi.
Affidavit.
vii.
Temporary.
viii.
Responsibility.
ix.
Recognized.
x.
Explanation.
xi.
Privilege.
xii.
Noting.
xiii.
Casual.
xiv. Compassionate grounds.
xv.
Un fit.
|ɶxÉ 2. - ¤ÉSSÉÉå {É®ú ]äõ±ÉÒÊ´ÉVÉxÉ EòÉ |ɦÉÉ´É BEò
´É®únùÉxÉ ªÉÉ +ʦɶÉÉ{É * <ºÉ Ê´É¹ÉªÉ {É®ú ºÉÆIÉä{É ¨Éå ÊxɤÉxvÉ Ê±ÉJÉå
*
Part – II ( Technical Part )
Maximum
Marks – 90
Attempt
any 6 questions out of the given 9. All questions carry equal marks.
Question
1 and 2 are multiple choice questions. Write down the question number and the
correct alternative i.e. a,b,c,d in front of the question number. For instance
if the correct alternative of question no 1.2 is be then write down the answer
as – 1.2 ( b )
Question No. 1 –
1.1 -Overhauling of track should
normally be completed in –
( a ) Two years. ( b ) Ten years. ( c ) Six years. ( d )
Normally over a period of 3 to 5 years.
1.2. -Manual deep Screening of track on IR under a speed restriction of –
( a ) Stop Dead and 10 kmph. ( b ) 15 kmph. ( c ) 20 kmph ( d ) 30 kmph.
1.3. –As per IRPWM the speed of a deep screening site with machine packing
can be relaxed to normal in a minimum of – ( a ) 10 days. ( b ) 21 days. ( c ) 14 days. ( d ) 7 days.
1.4. – A CWR is a LWR which –
( a )
requires to be distressed in parts. ( b
) passes through station yards including points and crossings. ( c ) Requires special precautions for
maintenance. ( d ) None of the above.
1.5. – If the maximum rail temperature at a station is 600 C and
minimum temperature is – 50 C it will fall in – ( a ) Zone I ( b ) Zone II
( c ) Zone III ( d ) Zone IV
1.6. – If
an LWR is to be laid over a girder bridge the type of rail sleeper fastenings
to be used are – ( a ) creep resistant fastenings. ( b ) rail free fastenings. ( c ) elastic fastenings. ( d ) Rigid fastenings.
1.7.- If a turn out takes off from the inside of a mainline curve, the
cant which can be provided on the mainline will be governed by considerations
of – ( a ) cant excess. ( b ) cant deficiency. ( c )
equilibrium cant. ( d ) None of the above.
1.8. – The Assistant Engineer’s inspection of points and crossings in a
year is – ( a ) 50% of all points and crossings in his jurisdiction. ( b ) 100% of all points and crossings in
his jurisdiction.
( c )
100% of all points and crossings on running lines and 25% of all points on
other lines. ( d ) 100% of all
points and crossings on running lines and 10% of all points on other lines.
1.9. The service life in terms of total GMT of traffic carried for
considering through rail renewal on the bridge proper and in the bridge
approaches for 60 kg 90 UTS rails is –
( a ) 800
GMT ( b ) 550 GMT ( c ) 350 GMT ( d ) 400 GMT.
1.10. –
Maximum value of cant deficiency permitted on A
& B routes is –
( a ) 100
mm ( b ) 75 mm. ( c ) 50 mm. ( d ) 125 mm.
Question No. 2. –
2.1. – As per
bridge manual the maintenance of a 24.4 m. span steel girder will be done by –
( a )
Assistant Engineer of the section. (
b ) IOW of the section. ( c ) PWI
of the section. ( d ) AEN / XEN Bridge
of the section.
2.2. – Hollows in masonry piers and abutments should be filled up by – ( a ) Epoxy grouting. ( b ) Gunniting. ( c ) Shotcreting. ( d ) Cement pressure grouting.
2.3. –
The elcometer is a device used to measure – ( a ) Dry film thickness of
paint. ( b ) Cover below
reinforcement. ( c ) Moisture content in
sand. ( d ) Setting time of concrete.
2.4. – While
constructing approaches for ROBs in built up area land acquisition can be
reduced by using – ( a ) Geotextiles. (
b ) Soil anchoring. ( c ) Reinforced
earth. ( d ) Soil stabilization.
2.5. – Normal reinforcement can not be used in Prestressed concrete
structures because – ( a ) It is highly corrosion prone. ( b ) The losses will neutralize
the stress induced in it. ( c ) It
dose not have adequate ductility. ( d
) It dose not have adequate fatigue strength.
2.6. –
Piles generally used for bridge construction on IR are – ( a ) Pre cast concrete piles. ( b ) Timber piles. ( c ) Cast in situ bored concrete piles. ( d ) steel pile.
2.7.- Bentonite is a material used – ( a ) To improve the slump
of concrete. ( b ) To prevent caving in of the bore
hole walls. ( c ) To
increase the strength of concrete. ( d
) None of these.
2.8. – Which is no a component of an arch bridge - ( a ) Spandrel. ( b ) Crown. ( c ) Parapet. ( d ) Stringer.
2.9.- The most reliable method for assessing the load carrying of a pile
in a given strata is – ( a ) Static formula.
( b ) Dynamic formula. ( c ) Pile
load test. ( d ) None of the above.
2.10. –
For checking the versines of turn in and turn
out curves of a turn out the length of chord used as per IRPWM is – ( a ) 3
m. ( b ) 6 m. ( c ) 11.8 m. ( d ) 20 m.
Question No. 3 – Write down the steps involved in complete realignment of a curve.
Question No. 4 – Write salient features of MEXE and RING 1.5 programme to check
the strength of arch bridge.
Question No. 5 – Write short notes on following –
i.
Action to be taken on
detection of faulty welds or rails during USFD testing.
ii.
Hot weather patrolling.
Question No. 6 – Write short notes on any two of the following –
i.
Water proofing treatment
on roofs.
ii.
Quality checks for
ensuring quality of ballast.
iii.
Compaction testing of
soils.
Question No. 7 – What are the precautions to be observed when working with tie
tamping machines before tamping, during tamping and after tamping operations.
Question No. 8 – Write down the steps involved in distressing of LWRs using tensor.
Question No. 9 – What are the tests to be conducted to ensure good quality concrete
while concreting a Prestressed concrete girder.
Part – III ( Finance and Establishment )
Maximum
marks – 45
Answer any 3 questions out of 5.
All question carry equal marks.
Question
1 is a multiple choice questions. Write down the question number and the
correct alternative i.e. a,b,c or d in front of the question number. For instance
if the correct alternative of question no 1.2 is be then write down the answer
as – 1.2 ( b )
Question No. 1 –
1.1 Demand No. 4 of the railway budget pertains to –
( a ) Repairs and maintenance of motive
power.
( b ) Operating expenses rolling stock
and equipment.
( c ) Assets – Acquisition, Construction
and Replacement.
( d ) Repairs and maintenance of
permanent way.
1.2. Use of
railway land for keeping cattle, throwing refuse etc unauthorized way leave
facilities constitutes – ( a ) Hard
encroachments.
( b ) Soft encroachment.
( c ) Do not
form an encroachment at all.
( d ) None of these.
1.3. RTI act
was promulgated in – ( a ) 1996 ( b )
2000 ( c ) 2005 ( d ) 1990
1.4. Recruitment
of group D staff will hence forth be done by – ( a ) Railway Board. ( b ) Railway Recruitment Board.
( c ) PWI in case
of engineering department. ( d )
Recruitment cell under DyCPO ( recruitment )
1.5. Class I
officers joining the Indian railway Service of Electrical Engineers under go
Centralized training at - ( a ) Nasik . ( b ) Jamalpur. ( c ) Vadodara. ( d ) Pune.
1.6. Direct Recruitment to Group C for Kota division is done by railway recruitment board located
at - ( a ) Kota ( b ) Ajmer ( c ) Bhopal ( d ) Jabalpur .
1.7. The
earnest money for a tender costing 50 lacks will be – ( a ) 2 Lacks. ( b ) 1 Lack. ( c ) 3 Lacks. ( d ) 1.5 Lacks.
1.8. Group A
and B officers of IR are entitled to –
(
a ) 6 sets of privilege passes and 4 sets of PTOs.
(
b ) 6 sets of privilege passes and 3 sets of PTOs.
(
c ) 6 sets of privilege passes and 6 sets of PTOs.
(
d ) 3 sets of privilege passes and 3 sets of PTOs.
1.9. An
employee can avail of leave encashment to the extent of amount of LAP to his
credit subject to a maximum of - ( a )
210 days. ( b ) 300 days. ( c ) 240 days. ( d ) none of the these.
1.10. SRSF has been
set up to – ( a ) Improve
passenger amenities at stations.
( b ) Improve staff amenities in colonies. ( c ) Improvement of railway running
rooms. ( d ) To wipe out arrears
of replacement of safety related assets on IR.
Question No. 2 – Write
short notes on any two of the following –
i. Digitisation of land plans.
ii. Jatropha plantation.
iii. Earnings from land resources.
Question No. 3 – Write
short notes on any two of the following –
iv. Touch and feel works.
v. Provision for extension of completion period of a contract under
GCC.
vi. Open, limited and single tender.
Question
No. 4 – What are the different plan heads
under demand No. 16 of the budget relevant to the engineering department.
Question
No. 5 – List
the various types of major penalties and write down the steps to be followed
for imposing a major penalty.
*****************************
Southern
Railway
LGS
Examination – Civil Engineering
Supplementary
Examination
Date
: 20.07.2008
( Maximum Marks 150 ) Time : 3 hours
Notes
:
i. Answer all three
parts A, B, and C
ii. Indicate Part reference
and Question reference in your answers.
iii. Write legibly and
sketch neatly.
PART ‘A’ : Answer any
Ten questions
10 x 2 = 20 marks
- Define equilibrium super elevation.
- Define distressed bridge.
- Define accommodation works.
- Define Fineness modulus.
- Define Plasticity index.
- Define symmetrical split.
- Define track modulus.
- Explain in short Q50 and Q100.
- Explain in short special disability leave.
- Prescribed language for communication between Kerala Government and
Southern Railway under Official Language Policy.
- Explain in short Urgency Certificate.
- Explain in short Controlled Concrete.
PART ‘B’ : Answer any
Ten questions
10 x 3 = 30 marks
- Why
extra clearance are required in curves.
- Classification
of rail defects – List out and explain in sort.
- Coning
of wheals – why provided.
- Engineering
Indicators at unmanned level crossings – List out the provisions.
- Index
Plan and Index section - Explain in short.
- Metallising
of bridge girders – basic concepts.
- Check
rails and guard rails - basic concepts on provisions.
- Distinguish
between Substitute and Casual Labour in railway Service.
- PNM -
basic concepts
- Functions
of TOLIC under Official Language Implementation.
- Eligibility
criteria in works tenders – how specified.
- No
claim and no due certificates - basic concepts.
PART ‘C’ : Answer any
Ten questions
10 x 10 = 100 marks
- Explain in detail the modus operandi with sketch for rebuilding of
single span masonry arch bridge with single span girder bridge.
- Explain in detail with sketches the regirdering of multi span deck
type girders of bridge by gantry method.
- Explain the procedure for realignment of curve.
- What are the advantages and disadvantages of concrete sleepers.
- Explain in detail with sketches the track protection at work site
for works of short duration and long duration.
- List out the different types of water treatment and explain any one
method in detail with sketch.
- What are the Employer’s liabilities for compensation under Workmen’s
compensation Act.
- List out the various surveys conducted for construction Projects and
explain in detail any two types of
surveys.
- Explain
the procedure for processing variations and vitiation in works contracts.
- What are the prescribed languages for communication between Central
and State Governments under Official Language Policy. What are the Policy
instructions on notings in Central Government Offices.
- Draw a quantity schedule and work out rate analysis for CTR work of
replacing 90 R rail CST9 sleeper
track with 52 kg rail concrete sleeper track. Make your own
reasonable assumptions.
- List out the different types of platform surfacing adopted in
Southern Railway and explain in detail construction procedure with
specifications for any two types.
*********************************************
Southern
Railway
LGS
Examination – Civil Engineering
Date
: 10.01.2010
( Maximum Marks 150 ) Time : 3 hours
Notes
:
i. Answer all three
parts A, B, and C
ii. Indicate Part
reference and Question reference in your answersCorrectly.
iii. Write legibly and
sketch neatly.
PART ‘A’ : Answer all
questions 10 x 2 = 20 marks
1.
Minimum Formation width of BG bank is ………………….
2.
R in 90 R track refers to
…………………………………….
3.
M in M+7 track refers to
…………………………………….
4.
CC in CC+8+2 route refers to
………………………………
5.
P in SPT of soil refers to
…………………………………….
6.
Q in Qf flood refers
to …………………………………….
7.
D in DS8 stores refers to
…………………………………….
8.
PU 32 expenditure refers to
…………………………………
9.
Minimum permitted guard rail clearance in bridge is
……………………….
10.
Minimum permitted check rail clearance on curve is ……………………….
PART ‘B’ : Answer in
short any Six questions 6
x 5 = 30 marks
- State the basic purpose of providing check rail and list the
locations whom check rails are provided.
- Explain the purpose of provision of sand hump important
constituents.
- Explain the provision of eligibility criteria in works tenders.
- Define residual chlorine and explain how it is tested.
- State the advantages of metallising of girders and where it is
preferred.
- What are accommodation works . List the typical works.
- List the surveys under taken for the Railway projects.
- Write short notes on Permanent Negotiating Machinery ( PNM )
PART ‘C’ : Answer any
Five questions
5 x 20 = 100 marks
Sketch neatly typical well foundation for bridge and
explain in detail how it is constructed.
Explain how works are tendered and awarded in
Engineering department.
Explain various steps taken by southern Railway in
implementing Official Language Policy.
What privileges are you entitled under Pass Rules.
Explain in detail the procedure for removal of
encroachments on Railway land.
CENTRAL RAILWAY
L.G.S. EXAMINATION – CIVIL ENGINEERING
Date
: 23.04.2011
( Maximum Marks 150 ) Time : 3 hours
Instructions
:
1.
Candidates
have option to answer either in Hindi or in English. In case of any mistake of
ambiguity in Hindi version. The English version will prevail.
2.
Candidates
should not write their name, Roll Number, initials, designation, signature,
address or any other identification mark any where on the answer paper. As this
will disqualify them for the selection. They should not draw any symbol sign or
write any such thing as SHRI GANESHAYA NAMAHA, HARI OM, OM ,
SHRI SWAMI SAMARTH etc, on their answer papers. They should not use different
coloured pens other than blue or black pens for writing the examination.
3.
This
paper contains Three parts, viz. A, B &c. The instructions for each section
are indicated at the beginning of the section. Attempt all parts.
4.
The
blank spaces between the answers and blank pages at the end should be crossed
by the candidates before depositing the answer scripts.
5.
Answer
should be brief & to the point.
PART
‘A’
Attempt any six
questions of the ten listed below. All questions carry equal four marks. One
mark kept for neatness.
( 6 x 4 = 24 marks )
1. Why is earnest money taken ?
2. When is supplementary estimate prepared?
3. What is Operating ratio?
4. What do you understand by departmental charges as defined in Para 1137 of engineering code?
5. Indicate the procedure to sanction office building costing 42 Lakhs.
6. What are the consequences to after termination of contract.
7. What do you understand by primary unit of expenditure?
8. State the difference between stock and non stock item?
9. What is the importance of Pink book in railway working.
10. What is the object of including arbitration clause in contract?
Part “ B “
Write
short notes on any six. All questions carry equal four marks. One mark
kept for neatness.
( 6 x 4 = 24 marks )
1.
Compassionate Appointment
2.
Overtime Allowance
3.
Commutation of pension
4.
Filling posts of Artisans
5.
House Building Advance
6.
Major Penalties
7.
Vacancy Bank
8.
Voluntary Retirement
9.
Staff Benefit Fund
10. Night Duty Allowance
Part
‘C’
Attempt any ten
questions. All
questions carry equal ten marks.
- Draw
a hand sketch showing position of engineering indicators in case of multi
speed restrictions (Speed increasing in direction of train)
- What
are important points to be kept in mind to maintain switches in good
condition?
- What
precautions are to be taken during deep screening by BCM, followed by
tamping machine & DTS?
4. a) What
is the difference between insulated joint and glued insulated joint? ( 5 marks
)
b) What is the purpose of providing structure
bonds in electrified section? ( 5 marks )
5. Indicate the difference between any four- 4 X 2.5 = 10 marks.
a) Relaxation of speed by
manual & machine packing.
b) Nominal mix and design mix
of concrete
c) IMR & OBS defects
d) Bracings & Stiffeners (
Related to girder bridges)
e) Switch Expansion joint &
Buffer rails
f) Interlocked & non
interlocked gates.
6. Indicate in brief essential components of a water treatment plant to
treat water from a river source. Purpose of each should also be given. (No
sketches needed)
7. हिंदी का कार्यसाधक ज्ञान प्राप्त
करने की क्या शर्तें हैं?
8. Indicate scheme &
precautions for executing work of constructing new foot over bridge in
electrified section. ( no sketches needed)
9. Indicate procedure
& measures for obtaining best results from design mode tamping.
10. As an ADEN you to plan a canal
crossing bridge ( Box design ) for single line. Draw a labeled diagram for
layout of temporary diversion giving formula for calculating over all length.
11. List out various members of a through type steel
bridge. Explain working & maintenance of Rocker & Roller bearing. ( 6 + 4 = 10 marks )
12. State in brief
various quality control measures for executing earth work ( including
blanketing layer )
13. Explain the
precaution & procedure for replacing an old 1 : 12 turnout by new concrete
sleeper layout using T – 28 Machine. ( In a busy electrified section ).
14.Explain the technical
aspects of any two of the following.
( a ) Transition curve and Cant Gradient.
( b ) Painting specification for steel
bridges.
( c ) Abrasion Value & Impact Value of
ballast sample.
( d ) Use of Rail tensors.
15. Indicate the various
stages involved in acquiring land for a new line project.
*****************************************
West Central Railway
Engineering Department
Selection for the post of ADENs Group – ‘B’ ( 70% LGS quota )
Time : 3 hours 31 – 03 -
2012
Maximum marks : 150
Important Instructions :
- Attempt any 5questios from section – ‘A’ and any 3 questions from
section –‘B’. Section – ‘C’ is compulsory.
- Marks allotted to questions have been indicated against each.
- In case of any discrepancy between English and Hindi versions,
contents of English version to be treated as correct.
- No correction / alteration is allowed in answering Question no. 7. In
case any correction / alteration is made then the answer will not be
evaluated.
Section – ‘A’
1. ( a ) An emergency crossover has to be laid between two
parallel running tracks on a 20 curve with track center of 5.10 meters at one
end of a station. Draw a suitable sketch and indicate the type of turnouts
which should be used. Also describe the procedure of laying the crossover so
that there should not be any kink between back of crossing of the two
turnouts.
( 15 )
Subscribe to:
Posts (Atom)
Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information.
NOTE: We do not take any responsibility of authencity of Information/News/Videos.
Labels
Q Bank - Establishment / Personnel Dept.
Q BANK - Operating
Q Bank - Electrical Engineering
Q Bank - OS / Clerk / Typist
Q Bank - Goods Guards
Group 'B' Exam
Q Bank - APO ( Asst. Personnel Officer)
QUESTION BANK WITH ANSWER
Q B Establishment
Q Bank - OHE/TRD/PSI
Q BANK - C & W ( Carriage & Wagon )
Q B - Welfare Inspector
Q B - CIVIL ENGINEERING (AEN)
Q Bank - Account
Q BANK - LOCO
Q BANK Exam - Station Master
Q Bank - Commercial
Q Bank - AOM
Q BANK - Station Master
Q Bank - Goods Guards (Train Manager)
Q Bank - S & T
Q Bank - D & AR (Discipline and Appeals Rule)
Q Bank - Medical
2. Q Bank - Group D To C
QB - ENGINEERING ( MECHANICAL )
RRB EXAM
NTPC
Question & Answer
Q Bank - LOCO (Diesel)
Q Bank - ACM (Assistant Commercial Manager)
Q BANK - Jr Engineer ( Diesel Mechanical )
Q BANK - LOCO (AC)
Q Bank - Law Assistant
Departmental Exam
Q Bank - AME/AWM
Q Bank - Group D To C
Q Bank - Appointment On Compassionate Ground Exam
Q Bank - General Knowledge
Q Bank - Publicity Inspector
Q Bank - Rajbhasha (राजभाषा)
Q Bank - Stores
Q Bank - ADSTE / ASTE
Q Bank - AEE
Q Bank - CLI
Short Notes
Q Bank - Commercial Instructor Exam
Q Bank - Engineering (Bridge)
Q Bank - IT
Q Bank - Leave Rule
Q Bank - Ministerial Staff
Q Bank - Protocol Inspector
Q Bank - RPF Department
FAQ
GDCE Exam
Q BANK - Jr Engineer ( Mechanical )
Q Bank - C & M
Q Bank - CCTC
Q Bank - Carpenter
Q Bank - General English
Q Bank - Jr Engineer (Tele)
Q Bank - Track Machine
Q Bank -Section Controler
Video
IRMS (Indian Railway Management Service
JUNIOR ENGINEER (Non -AC) GRADE - II
Minimum Wages Act
Q BANK & Answer - C & W ( Carriage & Wagon )
Q BANK - Shunting Master
Q Bank - Instructor
Q Bank - AMM
Q Bank - All Department
Q Bank - Ballast Train Checker
Q Bank - Complaints Inspector
Q Bank - GK (Computer)
Q Bank - Mason
Q Bank - Maths
Q Bank - NPS (New Pension Scheme)
Q Bank - Pass Rule
Q Bank - Planning Inspector
Q Bank - Railway (GK)
Q Bank - Stenographer
Q Bank - Technician (Ele)
Q Bank - Traffic Costing Inspector
Question Bank - Technicians of TLAC Group.
Question Papers