SEARCH

Q Bank & Answer - Electrical Engineer -.EOG POWER CAR

1. What is the meaning of EOG? (b)

a. End off generation 

b. End on generation

c. End over generation 

d. All the above.

Answer - b. End on generation


2. What is the supply voltage of EOG system? (d)

a. 415 V AC 

b. 440 V AC

c. 750 V DC 

d. 750 V AC

Answer - d. 750 V AC


3. What is the capacity of alternator of EOG power car? (c)

a. 280 KVA 

b. 490 KVA

c. 500 KVA 

d. 450 KVA

Answer - c. 500 KVA 


4. What is the unit for capacity of a diesel engine? (c)

a. HP 

b. HHP

c. BHP 

d. KVA

Answer - c. BHP 


5. What is the operating speed of diesel engine of EOG power car? (b)

a. 1800 rpm 

b.1500 rpm

c. 2000 rpm

d 1000 rpm

Answer - b.1500 rpm


6.What is the battery voltage and capacity of engine staring batteries in EOG power car? (b)

a. 8V 290 AH 

b 24V 290 AH

c. 24V 450 AH 

d.8V 450 AH

Answer - b 24V 290 AH


7. No. of engines available in a EOG power car is _____? (b)

a. 1 

b 2

c. 4 

d.3

Answer - b 2


8. What is the quantity and capacity of transformers in LHB type EOG power car? (c)

a. 2 nos. of 50 KVA and 1 no. of 60 KVA 

b. 4 Nos. of 50 KVA

c. 3 Nos. of 60 KVA 

d. 20 Nos. of 50 KVA and 2 Nos of 60 KVA

Answer - c. 3 Nos. of 60 KVA 


9. How may ventilator fan motors are avialable in a EOG power car? (b)

a. 3 

b.4 

c. 2 

d.8

Answer - b.4 


10.What is the rating of ventilator fan motor of EOg power car? (a)

a.7 .5 HP 

b.5 HP 

c. 10 HP 

d.20 HP

Answer - a.7 .5 HP 


11.High water tempertaure switch of diesel engine of Power car is set at what temperature? (d)

a. 100 deg C 

b.99 deg C 

c. 95 deg C 

d 97 deg C

Answer -  d 97 deg C


12. What does LLOP stand for? ( a)

a. Low lube oil pressure 

b.Low lube over pressure

c. Low level oil pressure 

d.Lower level oil pressure

Answer -  a. Low lube oil pressure 


13. Over speed switch of diesel of EOg power car is set at _____ rpm? ( b)

a. 1500 +/- 5 % rpm 

b. 1800 +/- 4.5 % rpm

b. 1800 rpm 

d. 1500 rpm

Answer -   b. 1800 +/- 4.5 % rpm


14. The UVR of alternator of power car operates at set voltage of _______? (c)

 a. 600 V 

b. 715 V 

c. 687 V 

d .650 V

Answer - c. 687 V 


15. What is the MPCB rating of radiator control panel? ( d)

a. 68A 

b. 75A 

c.40A 

d .63A

Answer - d .63A


16. What is the rating of MPCB of ventilator panel? ( b)

a. 16A 

b.10A 

c. 5A 

d. 15A

Answer - b.10A 


17. Smoke detector in LHB power car works on _____V? ( c)

a. 24V DC 

b. 110V AC 

c. 110V DC 

d. 24V AC

Answer - c. 110V DC 


18. What is the input voltage of SBCR (Starting battery charger) of Power car? (c)

a. 110V DC 

b. 415 V AC 

c. 230V AC 

d. 110 V AC

Answer -c. 230V AC 


19. WHat is the protections provided in alternator of power car? (d)

 a.Short circuit 

b.Overload 

c.Earth Fault 

d. All the above 

Answer - d. All the above 

No comments:

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information.

NOTE: We do not take any responsibility of authencity of Information/News/Videos.

INDEX II

Q Bank - Establishment / Personnel Dept. (82) Q Bank - Electrical Engineering (79) Q Bank - OS / Clerk / Typist (71) Q B Engg (P Way & Work) (67) Q BANK - Operating (62) Group 'B' Exam (60) Q Bank - APO ( Asst. Personnel Officer) (57) QUESTION BANK WITH ANSWER (55) Q B Establishment (47) Q Bank - Goods Guards (45) Q Bank - OHE/TRD/PSI (36) Q B - CIVIL ENGINEERING (AEN) (27) Q B - Welfare Inspector (27) Q BANK - C & W ( Carriage & Wagon ) (26) Q Bank - Account (24) Q BANK - LOCO (23) Q BANK Exam - Station Master (23) Q Bank - Commercial (21) Q Bank - AOM (19) Q BANK - Station Master (18) Q Bank - S & T (14) 1. Syllabus (13) Q Bank - D & AR (Discipline and Appeals Rule) (12) Q Bank - Medical (12) Q Bank - Posts (Civil Engineering & P way) Dept (12) 2. Q Bank - Group D To C (11) INDEX (11) QB - ENGINEERING ( MECHANICAL ) (11) Q Bank - LOCO (Diesel) (9) Q Bank - ACM (Assistant Commercial Manager) (9) Q BANK - Jr Engineer ( Diesel Mechanical ) (8) Q BANK - LOCO (AC) (8) Q Bank - Law Assistant (8) Q Bank - AME/AWM (7) Q Bank - Group D To C (6) Q Bank - Stores (5) RRB EXAM (5) NTPC (4) Q Bank - ADSTE / ASTE (4) Q Bank - AEE (4) Q Bank - CLI (4) Q Bank - General Knowledge (4) Q Bank - Publicity Inspector (4) Q Bank - Rajbhasha (राजभाषा) (4) Question & Answer (4) Q Bank - Appointment On Compassionate Ground Exam (3) Q Bank - Commercial Instructor Exam (3) Q Bank - Engineering (Bridge) (3) Q Bank - IT (3) Q Bank - Protocol Inspector (3) Q Bank - RPF Department (3) Short Notes (3) Q BANK - Jr Engineer ( Mechanical ) (2) Q Bank - C & M (2) Q Bank - Carpenter (2) Q Bank - General English (2) Q Bank - Jr Engineer (Tele) (2) Q Bank - Ministerial Staff (2) Q Bank - Track Machine (2) Q Bank -Section Controler (2) Video (2) ABB (1) FAQ (1) GDCE Exam (1) IRMS (Indian Railway Management Service (1) JUNIOR ENGINEER (Non -AC) GRADE - II (1) Minimum Wages Act (1) Project & Planning (1) Q BANK & Answer - C & W ( Carriage & Wagon ) (1) Q BANK - Shunting Master (1) Q Bank - Instructor (1) Q Bank - AMM (1) Q Bank - All Department (1) Q Bank - Ballast Train Checker (1) Q Bank - CCTC (1) Q Bank - Complaints Inspector (1) Q Bank - GK (Computer) (1) Q Bank - Leave Rule (1) Q Bank - Mason (1) Q Bank - Maths (1) Q Bank - NPS (New Pension Scheme) (1) Q Bank - OS / Clerk Typist (1) Q Bank - Pass Rule (1) Q Bank - Planning Inspector (1) Q Bank - Railway (GK) (1) Q Bank - Stenographer (1) Q Bank - Traffic Costing Inspector (1) Question Bank - Technicians of TLAC Group. (1) Short Notes - Establishment (1) Short Notes - Operating / Traffic (1)