Question Bank - OPERATING ( For Group "B" / Guard / Station Master etc) Part - 1A- Fill in the blank
Part I
Fill in the blanks:
1. Working time table is issued with the joint signatures of COM and ______.
2. There are _________ chapters in the book of G & SR.
3. There are _________ chapters in the Accident Manual.
4. Amount of air pressure in the engine and brake van of a passenger train at the starting station shall be 5.0 kg/cm2 and _________.
5. ________ mm of flat tyre is permitted in the locomotive of a goods train.
6. Guard shall show hand by day and __________ by night to the S.M. if the train is
standing clear of fouling mark.
7. Caution indicator is placed at a distance of _________ metres from the speed
indicator on a plain level.
8. Maximum speed of ‘A’ class ODC is ______ km/h.
9.Train entering into sand hump is a _________ type of accident.
10. Maximum permissible speed is determined by ____________.
11. Maximum speed while running through over 1 in 8 ½ turn-out with curved switch is ________.
12. Caution board is placed at a distance of ______ metres from the stop board.
13. Speed while dropping ballast from material train during run is _________.
14. If ‘A’ marker is extinguished in automatic section, signal is treated as _____.
15. Sound of two hooters means ____________.
16. Block over lap in MAUQ signaling system is ___________.
17. Information of permanent speed restrictions is provided in ____________.
18. In case of train parting, Guard shall show ____________ by day.
19. In case of train parting, Guard shall show ______________ by night.
20. In case of train dividing, hand brakes of _______ wagons of the remaining load are pinned down.
21. Loco Pilot shall sound ________ whistle while passing the IBS at ON after being
authorized by the SM in rear.
22. First detonator is placed at a distance of _______ metres from the obstruction in
narrow gauge.
23. Before demanding assisting engine, train is to be protected from _________.
24. Speed of the first train during ACF on double line is ____________ km/h.
25. During ACF on single line, T/B 602 is issued to Loco Pilot to _____________.
1) CPTM 2) 18 3) 8 4) 4.8Kg/cm² 5) 50mm 6) White light
7) 770 8) Normal 9) Indicative Accident 10) CRS 11) 15 kmph 12) 1170
13) 8 km/h 14) Manually operated 15) ART required at Home station 16) 180 meter
17) WTT 18) Green flag vertically up and down, 19) White lamp vertically up and down
20) 10 Unit or 50% whichever is more 21) short long short 22) meter 23) both directions
24) 25/10/walking 25) To open the communication
Fill in the blanks:
26. During shunting Impact speed of 5 box wagons is _________.
27. Validity of the brake power certificate of air braked material train is ________.
28. In ghat section, distance between caution and speed indicator is _______.
29. When train is divided, Guard shall issue _______ authority to Loco Pilot.
30. Number of the Train Intact Arrival Register is __________.
31. Speed of first train during temporary single line working is _______ km/h.
32. To clear the section, maximum speed of the train with flat tyre is _____ km/h.
33. Maximum speed when head light becomes defective is ____________.
34. Loco Pilot shall sound ____________ whistle to call Guard to Engine.
35. Train is protected from __________ in one train only system.
36. Brake power in the C C rake goods train at a starting station shall be ____%.
37. Stop indicator is placed at a distance of ________ metres from the place of
obstruction.
38. On seeing defective stop signal during train working, Loco Pilot will sound
____________ whistle to inform the same.
39. In the absence of red light in hand signal lamp, danger signal can be shown by______________.
40. Medical relief van shall be dispatched within __________ minutes from double exit siding.
41. Speed of second train during temporary single line working is _________.
42. For extinguished home signal, Loco Pilot will be issued __________ authority form the station in rear in MACLS system.
43. Speed of train without brake van while passing through a station is _______.
44. Section controller shall transmit the correct time at _______ hours daily to all the stations.
45. Seciton controller is responsible for _________ on a section of a railway provided with the system of speech communication.
46. Approved special instructions are issued by _____________________.
47. Special instructions are issued by ___________________.
48. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensrue safety of the train and take the train upto _________________.
49. TSL is started between those two stations at which cross over facility are available and ____________ is treated as closed.
50. Maximum No. of _______ track machines can be sent for working in a block section.
26) 2 km/h 27) days 28) meter 29) T / 609 30) T / 1410 31) 25 km/h
32) 20 km/h 33) 40 km/h 34) Two long two short 35) Base station 36) 100
37) meter 38) One long two short 39) violently waving a white horizontally across the body
40) 15 41) Normal 42) T / 409 43) Normal 44) 16.00 45) movement of Traffic
46) CRS 47) COM 48) next examine 49) C class / IBS 50) 5
Fill in the blanks:
51. Speed of train shall not be more than ______________ km/h in case of whistle failure in block section.
52. Max. Speed of passenger train attached with four wheeler wagon shall be _____km/h.
53. Block competency certificate is given in the prescribed form ____________.
54. Block competency certificate is issued by ____________________.
55. Gateman competency certificate of interlocked traffic gate is signed by TI and SE
(Sig) and counter signed by _____________.
56. Record of caution order is kept for __________ months.
57. Knowledge of subsidiary rules is examined by ____________ if train working staff of
another Railway is required to work on our Railway.
58. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within _________ days of resumption of normal working.
59. Rake link book-let is prepared by COM and _________.
60.Station working rules of an interlocked station is prepared by Sr. DOM and _________.
61. Station manager of a big station shall inspect the cabins atleast once in _________.
62. Signal sighting committee shall submit its report on form _______________.
63. For overhauling of lever frame at stations, _________ is prepared jointly by Sr. DOM and DSTE for working of trains.
64. When signal is not visible from minimum sighting distance, ________ signal is provided.
65. Sounding of 5 hooters means_____________________.
66. If a member disagrees with the reasons of the joint note of an accident, he may give _________.
67. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and __________ respectively.
68. Normally the train with hot axle is admitted on ____________.
69. Accident drill is ordered by DRM and is conducted under the supervision of ________.
70. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and _________respectively.
71. To send the assisting engine into obstructed block section T/A 602 authority is issued and the speed of engine shall be _________.
72. During serious accident, __________ will be the in-charge of control office.
73. SCOR maintains ________ register when serious accident occurs.
74. Whenever new signal is put into use, signal sighting committee submits its joint report on _________ form.
75. SM shall inspect the personal store of Guard once in ________months.
Part I
Fill in the blanks:
1. Working time table is issued with the joint signatures of COM and ______.
2. There are _________ chapters in the book of G & SR.
3. There are _________ chapters in the Accident Manual.
4. Amount of air pressure in the engine and brake van of a passenger train at the starting station shall be 5.0 kg/cm2 and _________.
5. ________ mm of flat tyre is permitted in the locomotive of a goods train.
6. Guard shall show hand by day and __________ by night to the S.M. if the train is
standing clear of fouling mark.
7. Caution indicator is placed at a distance of _________ metres from the speed
indicator on a plain level.
8. Maximum speed of ‘A’ class ODC is ______ km/h.
9.Train entering into sand hump is a _________ type of accident.
10. Maximum permissible speed is determined by ____________.
11. Maximum speed while running through over 1 in 8 ½ turn-out with curved switch is ________.
12. Caution board is placed at a distance of ______ metres from the stop board.
13. Speed while dropping ballast from material train during run is _________.
14. If ‘A’ marker is extinguished in automatic section, signal is treated as _____.
15. Sound of two hooters means ____________.
16. Block over lap in MAUQ signaling system is ___________.
17. Information of permanent speed restrictions is provided in ____________.
18. In case of train parting, Guard shall show ____________ by day.
19. In case of train parting, Guard shall show ______________ by night.
20. In case of train dividing, hand brakes of _______ wagons of the remaining load are pinned down.
21. Loco Pilot shall sound ________ whistle while passing the IBS at ON after being
authorized by the SM in rear.
22. First detonator is placed at a distance of _______ metres from the obstruction in
narrow gauge.
23. Before demanding assisting engine, train is to be protected from _________.
24. Speed of the first train during ACF on double line is ____________ km/h.
25. During ACF on single line, T/B 602 is issued to Loco Pilot to _____________.
ANSWER
1) CPTM 2) 18 3) 8 4) 4.8Kg/cm² 5) 50mm 6) White light
7) 770 8) Normal 9) Indicative Accident 10) CRS 11) 15 kmph 12) 1170
13) 8 km/h 14) Manually operated 15) ART required at Home station 16) 180 meter
17) WTT 18) Green flag vertically up and down, 19) White lamp vertically up and down
20) 10 Unit or 50% whichever is more 21) short long short 22) meter 23) both directions
24) 25/10/walking 25) To open the communication
Fill in the blanks:
26. During shunting Impact speed of 5 box wagons is _________.
27. Validity of the brake power certificate of air braked material train is ________.
28. In ghat section, distance between caution and speed indicator is _______.
29. When train is divided, Guard shall issue _______ authority to Loco Pilot.
30. Number of the Train Intact Arrival Register is __________.
31. Speed of first train during temporary single line working is _______ km/h.
32. To clear the section, maximum speed of the train with flat tyre is _____ km/h.
33. Maximum speed when head light becomes defective is ____________.
34. Loco Pilot shall sound ____________ whistle to call Guard to Engine.
35. Train is protected from __________ in one train only system.
36. Brake power in the C C rake goods train at a starting station shall be ____%.
37. Stop indicator is placed at a distance of ________ metres from the place of
obstruction.
38. On seeing defective stop signal during train working, Loco Pilot will sound
____________ whistle to inform the same.
39. In the absence of red light in hand signal lamp, danger signal can be shown by______________.
40. Medical relief van shall be dispatched within __________ minutes from double exit siding.
41. Speed of second train during temporary single line working is _________.
42. For extinguished home signal, Loco Pilot will be issued __________ authority form the station in rear in MACLS system.
43. Speed of train without brake van while passing through a station is _______.
44. Section controller shall transmit the correct time at _______ hours daily to all the stations.
45. Seciton controller is responsible for _________ on a section of a railway provided with the system of speech communication.
46. Approved special instructions are issued by _____________________.
47. Special instructions are issued by ___________________.
48. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensrue safety of the train and take the train upto _________________.
49. TSL is started between those two stations at which cross over facility are available and ____________ is treated as closed.
50. Maximum No. of _______ track machines can be sent for working in a block section.
ANSWER
26) 2 km/h 27) days 28) meter 29) T / 609 30) T / 1410 31) 25 km/h
32) 20 km/h 33) 40 km/h 34) Two long two short 35) Base station 36) 100
37) meter 38) One long two short 39) violently waving a white horizontally across the body
40) 15 41) Normal 42) T / 409 43) Normal 44) 16.00 45) movement of Traffic
46) CRS 47) COM 48) next examine 49) C class / IBS 50) 5
Fill in the blanks:
51. Speed of train shall not be more than ______________ km/h in case of whistle failure in block section.
52. Max. Speed of passenger train attached with four wheeler wagon shall be _____km/h.
53. Block competency certificate is given in the prescribed form ____________.
54. Block competency certificate is issued by ____________________.
55. Gateman competency certificate of interlocked traffic gate is signed by TI and SE
(Sig) and counter signed by _____________.
56. Record of caution order is kept for __________ months.
57. Knowledge of subsidiary rules is examined by ____________ if train working staff of
another Railway is required to work on our Railway.
58. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within _________ days of resumption of normal working.
59. Rake link book-let is prepared by COM and _________.
60.Station working rules of an interlocked station is prepared by Sr. DOM and _________.
61. Station manager of a big station shall inspect the cabins atleast once in _________.
62. Signal sighting committee shall submit its report on form _______________.
63. For overhauling of lever frame at stations, _________ is prepared jointly by Sr. DOM and DSTE for working of trains.
64. When signal is not visible from minimum sighting distance, ________ signal is provided.
65. Sounding of 5 hooters means_____________________.
66. If a member disagrees with the reasons of the joint note of an accident, he may give _________.
67. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and __________ respectively.
68. Normally the train with hot axle is admitted on ____________.
69. Accident drill is ordered by DRM and is conducted under the supervision of ________.
70. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and _________respectively.
71. To send the assisting engine into obstructed block section T/A 602 authority is issued and the speed of engine shall be _________.
72. During serious accident, __________ will be the in-charge of control office.
73. SCOR maintains ________ register when serious accident occurs.
74. Whenever new signal is put into use, signal sighting committee submits its joint report on _________ form.
75. SM shall inspect the personal store of Guard once in ________months.
ANSWER
51) 25 52) 75 53) T / 115 B 54) Principal, ZRTI 55) AOM (G) 56) 12
57) TI 58) 7 59) CPTM 60) Sr.DSTE 61) Once in a week 62) T / 102 B
63) Temporary working order 64) repeating 65) ART, MRV requiredat out station
66) Dissent 67) 4.7kg/cm² 68) Main line 69) ADRM/Sr.DSO/DSO 70) 50 mm
71) 15/10 km/h 72) Sr.DOM 73) Chronological 74) T /102 B 75) 3
Fill in the blanks:
76. Second train during all communication failure shall be dispatched after an interval of_____________ minutes.
77. Second train during TSL will be dispatched after __________.
78. During thick & foggy weather, line must be clear upto _____ for granting line clear at a B’ clas station in TALQ signalling system on Double line.
79. _______ bogies can be attached in rear of SLR of Mail/Express train.
80. Point indicator shows _______ light when the points are set for loop line.
81.Form number of disconnection and reconnection is __________.
82. Clocks of control office shall be synchronized with All India Radio at 08:00 hours, _______ hours and 21:00 hours.
83. Max. Speed of special train with 132 tonne bogie well wagon shall be ______ km/h.
84. “C” class ODC is run with the permission of _____________.
85. Station Working Rules of Non-interlocked station is signed by ________.
86. Loss of Railway property of __________ is treated as serious accident.
87. General rules may be modified by ___________.
88. Train entering catch siding is a type of _______ accident as per AM 2003.
89. Signal sighting committee consists of TI, SI/PWI and _________.
90. During prolonged failure of signals in automatic section, ________ authority is issued.
91. Information of caution notice stations is given in ______________.
92. If warner signal of any station becomes defective in off condition, ________ is issued
to Loco Pilot from the sation in rear.
93. If the Distant signal of a Gate becomes defective in off condition, __________ is issued to Loco Pilot from the station in rear.
94. Height gauge is for the safety of ____________.
95. Reference of ________________ is written by the side of the Rule if the Rule is corrected.
96. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
97. Target time for dispatch of ARME from single exit siding at night is _______ minutes.
98. While ordering ART/MRV each siren shall be sounded for ______ seconds.
99. While cancelling ART/MRV, siren shall be sounded for _____ seconds.
100. Station Master shall give line clear with _______ while granting line clear.
ANSWER
76) 30 77) Line clear 78) Home signal 79) 2 80) green 81) S&T (T /351)
82) 13:30 83) 30 km/h 84) CRS 85) Sr.DOM and Sr.DEN 86) More than 2 crore
87) Railway Board 88) Indicative 89) LI 90) T / D 912 91) WTT 92) Written memo
93) Caution order 94) OHE 95) no. and item no. of correction slip
96) three months 97) 20 minute 98) 45 99) 90 100) Private no.