SEARCH

Q Bank & Answer - Electrical Engineer -TL coach wiring

01. Capacity of rotary switches provided in rotary junction box is [ a ]

a)40A 

b)16A 

c)10A 

d)15A

Answer - a)40A 


02. Capacity of limit switch provided for alarm chain pulling indication light circuit [ a ]

 a) 10A 

b)15A 

c)35A 

d)40A

Answer -  a) 10A 


03. Size of rewirable fuse recommended for individual fan in 110V TL system is [ a ]

 a)35 SWG R/W 

b) 29 SWG R/W 

c)20 SWG R/W 

d) 22 SWG R/W

Answer -  a)35 SWG R/W 


04. Positive and negative cable in roof runs through on either side of coach to avoid [ c ]

 a) earth leakage 

b) over load 

c) short circuits 

d) none

Answer - c) short circuits 


05. Essential lights in SG TL coaches other than First class consists of [ a ]

 a) Lavatory lights, door way lights and Night lights and 50% of compartment lights

b) Lavatory lights

c) Lavatory and door lights

d) Lavatory, door lights and Night lights

Answer -  a) Lavatory lights, door way lights and Night lights and 50% of compartment lights


06. The wattage of TL Fan [ a ]

a) 32W 

b)10W 

c)80W 

d)60W

Answer - a) 32W 


07. The capacity of battery fuse for 110Volt SG TL coach is [ a ]

a) 40A HRC 

b) 16A HRC 

c) 10 A HRC 

d)4 A HRC

Answer - a) 40A HRC 


08. FRP tray shall be provided at the bottom of the battery box to avoid [ d ]

a) Corrosion of the battery box from splitting of acid

b) Electrical insulation for battery and battery box

c) Vibration of batteries

d) all of the above

Answer -  d) all of the above


09. The minimum clearance between the top of the battery and battery box for  maintenance of cells shall have [ b ]

a)50mm 

b)150mm 

c)100mm 

d)none

Answer - b)150mm 


10. The size of the Fan provided on SGBG coaches of 110V system [ a ]

a)400mm sweep 

b)300 mm sweep 

c)225 mm sweep 

d)200 mm sweep

Answer -  a)400mm sweep 


11. The total number of V belts provided to the drive TL alternator 4.5KW are [ a ]

a) 4 

b)6 

c)2 

d)3

Answer - a) 4 


12. The train lighting wiring is [ b ]

a) two wire earthed system 

b) two wire unearthed system

c) one wire earthed system 

d)none of the above 

Answer - b) two wire unearthed system


13. The insulation resistance of 110V coach when measured with 500V Megger during healthy weather condition [ a ]

a) 2mega ohms 

b) 1 mega ohms

c)3 mega ohms 

d)0.5 mega ohms

Answer - a) 2mega ohms 


14. The insulation resistance of 110V coach when measured with 500V Megger during adverse weather condition [ b ]

a) 2mega ohms 

b) 1 mega ohms 

c)3 mega ohms 

d)none

Answer - b) 1 mega ohms 


15. Electrical fires on coach is mainly due to [ d ]

a) loose connections 

b)short circuits and earth faults

c) undersize cables 

d) all of the above

Answer - d) all of the above


16. The earth leakage can be checked both positive and negative cables at a time by [a ]

a) double test lamp method 

b) 500V megger

c) single test lamp 

d)none of the above

Answer -  a) double test lamp method 


17. Double test lamps are connected in [ a ]

a)series 

b) parallel 

c) both a&

b d)none

Answer -  a) series 


18. When double test lamp is connected to EFTB, red lead connected lamp glows and blue lead lamp does not glow then coach is [ c ]

a) healthy 

b)having positive earth 

c)having negative earth 

d) none

Answer - c) having negative earth 


19. When double test lamp is connected to EFTB, red lead lamp does not glows and blue lead lamp glows then coach is [ b ]

a) healthy 

b)having positive earth 

c)having negative earth 

d) both B&C

Answer -  b)having positive earth 

 20. The insulation resistance of coach is to be measured with [ a ]

a ) megger 

b)ohm meter 

c)continuity meter 

d)none

Answer - a ) megger 


21. The instrument used to measure the current without disturbing the circuit is [ a ]

a) tong tester

 b) tacho meter 

c) photo meter 

d)none

Answer - a) tong tester


22. Voltmeter is to be connected to the circuit in [ a ]

a)parallel 

b)series 

c)series and parallel 

d)none

Answer - a)parallel 


23. Ammeter is to be connected to the circuit in [ b ]

a)parallel 

b)series 

c)series and parallel 

d)none

Answer - b)series 


24. While measuring the earth leakages by double test lamp, lamps should have [ a ]

a) same wattage 

b) different wattage 

c)any wattage 

d)none

Answer - a) same wattage 


25. While giving supply to adjacent coaches through EFT the supply polarities are to be maintained [ a]

a)same polarity 

b)opposite polarity 

c)any polarity 

d)none

Answer - a)same polarity 


26. No generation of TL alternator is due to [ d ]

a) alternator Field/AC wire defective 

b) no residual magnetism

c) rectifier /regulator box defective

 d)any of the above

Answer -  d)any of the above


27. Cables used for wiring in coaches should have [ a ]

a) minimum joints 

b)five joints 

c)maximum joints 

d)none

Answer -  a) minimum joints 


28. The level of illumination will be measured by [ c ]

a)photo meter 

b)lux meter 

c)both A&B 

d)none

Answer - c)both A&B 


29. The percentage of spare coaches should be available in TL maintenance depot on traffic account is[ b ]

a) 10

 b) 5 

c) 6 

d) none

Answer -  b) 5 


30. The percentage of spare coaches should be available in AC maintenance depot on traffic account is [ c ]

a) 12 

b) 5 

c) 6 

d)none

Answer - c) 6 

No comments:

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information.

NOTE: We do not take any responsibility of authencity of Information/News/Videos.

INDEX II

Q Bank - Establishment / Personnel Dept. (82) Q Bank - Electrical Engineering (79) Q Bank - OS / Clerk / Typist (71) Q B Engg (P Way & Work) (67) Q BANK - Operating (62) Group 'B' Exam (60) Q Bank - APO ( Asst. Personnel Officer) (57) QUESTION BANK WITH ANSWER (55) Q B Establishment (47) Q Bank - Goods Guards (45) Q Bank - OHE/TRD/PSI (36) Q B - CIVIL ENGINEERING (AEN) (27) Q B - Welfare Inspector (27) Q BANK - C & W ( Carriage & Wagon ) (26) Q Bank - Account (24) Q BANK - LOCO (23) Q BANK Exam - Station Master (23) Q Bank - Commercial (21) Q Bank - AOM (19) Q BANK - Station Master (18) Q Bank - S & T (14) 1. Syllabus (13) Q Bank - D & AR (Discipline and Appeals Rule) (12) Q Bank - Medical (12) Q Bank - Posts (Civil Engineering & P way) Dept (12) 2. Q Bank - Group D To C (11) INDEX (11) QB - ENGINEERING ( MECHANICAL ) (11) Q Bank - LOCO (Diesel) (9) Q Bank - ACM (Assistant Commercial Manager) (9) Q BANK - Jr Engineer ( Diesel Mechanical ) (8) Q BANK - LOCO (AC) (8) Q Bank - Law Assistant (8) Q Bank - AME/AWM (7) Q Bank - Group D To C (6) Q Bank - Stores (5) RRB EXAM (5) NTPC (4) Q Bank - ADSTE / ASTE (4) Q Bank - AEE (4) Q Bank - CLI (4) Q Bank - General Knowledge (4) Q Bank - Publicity Inspector (4) Q Bank - Rajbhasha (राजभाषा) (4) Question & Answer (4) Q Bank - Appointment On Compassionate Ground Exam (3) Q Bank - Commercial Instructor Exam (3) Q Bank - Engineering (Bridge) (3) Q Bank - IT (3) Q Bank - Protocol Inspector (3) Q Bank - RPF Department (3) Short Notes (3) Q BANK - Jr Engineer ( Mechanical ) (2) Q Bank - C & M (2) Q Bank - Carpenter (2) Q Bank - General English (2) Q Bank - Jr Engineer (Tele) (2) Q Bank - Ministerial Staff (2) Q Bank - Track Machine (2) Q Bank -Section Controler (2) Video (2) ABB (1) FAQ (1) GDCE Exam (1) IRMS (Indian Railway Management Service (1) JUNIOR ENGINEER (Non -AC) GRADE - II (1) Minimum Wages Act (1) Project & Planning (1) Q BANK & Answer - C & W ( Carriage & Wagon ) (1) Q BANK - Shunting Master (1) Q Bank - Instructor (1) Q Bank - AMM (1) Q Bank - All Department (1) Q Bank - Ballast Train Checker (1) Q Bank - CCTC (1) Q Bank - Complaints Inspector (1) Q Bank - GK (Computer) (1) Q Bank - Leave Rule (1) Q Bank - Mason (1) Q Bank - Maths (1) Q Bank - NPS (New Pension Scheme) (1) Q Bank - OS / Clerk Typist (1) Q Bank - Pass Rule (1) Q Bank - Planning Inspector (1) Q Bank - Railway (GK) (1) Q Bank - Stenographer (1) Q Bank - Traffic Costing Inspector (1) Question Bank - Technicians of TLAC Group. (1) Short Notes - Establishment (1) Short Notes - Operating / Traffic (1)