SEARCH

Railway Question Bank & Answer - C&W Objective (True or false )

Railway Question Bank - C&W Objective  (True or false )

True or false 

1. Axle mounted disc system is provided in ICF coach. (T/F)

 2. 19 mm choke dia is provided in PEAV of LHB Coach (T/F)

 3. Maximum dia of axle mounted disc in LHB Coach is 640 mm (T/F) 

4. 2 No. of Air Conditioning Plant are provided in AC LHB Coach (T/F)

 5. Brake Cylinder dia of LHB Coach is 10 inch. (T/F)

 6. Piston Stroke of brake cylinder fitted in LHB Coach is 32 mm (T/F) 

7. Only Primary Suspension is provided in Fiat Bogie (T/F) 

8. POH of LHB Coach is carried out at nominated workshop (T/F)

 9. POH of LHB Coach is done on an interval of 36 months (T/F) 

10. IOH of LHB Coach is done on an interval of 18 months (T/F) 

11. Articulated control arms are provided in ICF Coach (T/F) 

12. Lateral and longitudinal guidance is provided by articulated arm in fiat bogie (T/F)

13. Condemning wheel diameter of LHB Coach is 825 mm (T/F) 

14. WSP system is provided in LHB Coach (T/F) 

15. CDTS System is not provided in LHB Coach (T/F) 

16. Maximum permissible speed of LHB Coach is 200 Km/h (T/F) 

17. CDTS discharges toilet waste only when train crosses the speed of 30 KMPH. (T/F) 

18. Weight per meter length of LHB coach is approximate 10% less than conventional Coach. (T/F)

 19. Single nest coil spring primary suspension is used in a FIAT. (T/F)

 20. Air spring pressure in hybrid coach is 5 kg/cm 2 . (T/F) 

21. There are 4 number of leveling valve provided in hybrid coach. . (T/F) 

22. In air spring ICF bogie 04 No. of duplex check valve are fitted. . (T/F) 

23. Position of leveling valve lever will be horizontal in air spring in case of proper Pressure. (T/F) 

24. 22.9 Tone is the axle load capacity of BOXN-R wagon. (T/F) 

25. BOXN-R wagon body is made of stainless steel (IRSM-44). (T/F) 

26. Floor sheet thickness OF BOXN-R wagon is 3.5 mm. (T/F) 

27. Side panel thickness of BOXN-R wagon is 2.0 mm. (T/F) 

28. In CDTS supply of air pressure is made through BP. (T/F) 

29. Main reservoir capacity of air spring fitted coach is 150 L. (T/F) 

30. Phonic wheel sensor is provided for detecting the speed in LHB coaches. (T/F) 

31. H type coupler is used in locomotives. (T/F) 

32. HTEA type coupler is used in wagon stock (T/F) 

33. Horizontal Gathering in H type coupler is +/-110 mm (T/F) 34. Knuckle pivot pin is provided in CBC to transfer tractive force. (T/F)

 35. Contour gauge no. 3 is used to detect defect in locking piece provided in CBC. (T/F)

 36. Distance between lever connector nose and bottom of the coupler body should not be less than 25 mm (T/F) 

37. Clear visibility of tell – tale slot in V shape of rotary lever indicates proper locking of Knuckle. (T/F) 

38. Function of anti creep device is to resist unlocking of CBC. (T/F) 

39. RF 361 draft gear is provided with H type coupler (T/F) 

40. MK-50 Draft Gear is provided with HTEA type coupler (T/F) 

41. Shank wear plate is provided in coupler body (T/F) 

42. Yoke pin is a headless pin (T/F) 

43. Elastomeric pads are provided in MK-50 draft gear. (T/F)

 44. Hauling capacity of HTEA coupler is 9000 ton. (T/F)

 45. Knuckle thrower in CBC is provided to unlock the CBC. (T/F) 

46. CBC operating handle is provided at right hand end of wagon. (T/F) 

47. Capacity of RF-361 draft gear is 5725 kgm. (T/F)

 48. Capacity of MK-50 draft gear is 5385 kgm (T/F) 

49. Capacity of HR-40 draft gear is 6200 kgm (T/F) 

50. Size of bearing piece slot of CBC operating handle is 17.5 mm (T/F) 

51. H type coupler is provided in LHB and ICF coaches both. (T/F) 

52. Inclination of slot in bearing piece slot of operating handle is 150 . (T/F) 

53. preload of draft gear in H type coupler is 30 kg N. (T/F) 

54. Maximum variation in CBC height is 75 mm. (T/F) 

55. CBC components are lubricated during ROH wagon. (T/F) 

56. Standard distance between knuckle nose and guard arm is 130 mm. (T/F) 

57. Knuckle pin is made of class Vsteel. (T/F) 58. Yoke pin is made of class IVsteel. (T/F)

 59. All electric locomotives are fitted with transition type CBC. (T/F)

 60. Toggle is a part of rotary lever assembly of CBC. (T/F) 

61. Cartage taper roller bearing is used in ICF Bogie. (T/F)

 62. IOH of ICF coach is done in after 09 months. (T/F) 

63. ‘A’ dimension of AC coach is 16$2@&0mm (T/F) 

64. Oil level in dashpot is 60mm. (T/F) 

65. Meaning of CIA is carriage alteration instructions. (T/F) 

66. Over hauling of Alarm Chain System is done in B Schedule. (T/F)

 67. Oil Capacity of Non- modified dashpot of ICF coach is 1.4 liter. (T/F) 

68. Speed of A class ODC in night is 40 KMPH. (T/F) 

69. IOH of shatabadi coach is done in 09 months. (T/F) 

70. Codal life of PCV is 40 years. (T/F) 

71. RA is a OCV. (T/F) 72. Over hauling of DV of BOXN wagon is done in 4.5 Year. (T/F) 

73. CTRB is used in BMBS Wagon. (T/F) 

74. Steaming is not done in tank wagon during POH. (T/F) 

75. Flat tyre limit on wagon is 65mm. (T/F) 

76. Wheel base of UIC Bogie is 2000±5 mm. (T/F) 

77. 12mm and 37 mm packing is used in UIC bogie. (T/F) 

78. Axle load of BOXN HA wagon is 22.9 Ton. (T/F) 

79. Codal Life BOXN is 30 year. (T/F)

 80. RA is a PCV. (T/F)

 81. Over hauling of coach DV is done in 05 Year. (T/F)

 82. SAB is fitted in BMBS. (T/F) 

83. Steam Cleaning of tank wagon is done during ROH (T/F) 

84. Flat tyre limit of wagon is 50MM. (T/F) 

85. Wheel base of casnub bogie is 2000+- 10mm. (T/F) 86. 12mm and 37 mm packing is used in casnub bogie. (T/F)

 87. Axle load of BOXN HS wagon is 22.9 Ton. (T/F) 

 88. Spherical roller bearing is used in ICF Bogie (T/F) 

89. POH of BVZI is done at the interval of 09 months (T/F) 

90. WAI means Carriage Alteration Instructions. (T/F) 

91. A- dimension of AC coach is 18±2/0 mm. (T/F) 

92. Breakage of CBC Knuckle is a ‘S’ mark rejection. (T/F) 

93. President of IRCA is General Mnanager of Northern Railway. (T/F) 

94. Wear in Knuckle of CBC is a ‘S’ mark rejection. (T/F) 

95. IRCA Rule Book part III is apllied for wagon stock. (T/F) 

96. IRCA Rule Book part IV is applied for coaching stock. (T/F) 

97. Breakage of spring is without ‘S’ mark rejection. (T/F) 

98. Rejections are given in chapter IV of IRCA Rule Book part III & IV. (T/F) 

99. Instruction of Rule Book part III & IV are mandatary to follow for maintenance. (T/F) 

100. Neutral Control department works under the control of Member Mechanical. (T/F) 

Answers.

1. F        2. T      3. T        4. T        5. T       6. F     7. F     8. T         9. T     10. T 

11. F        12. T    13. F    14. T     15. F     16. T   17. T    18. T     19. T     20. F

21. T        22.   F     23. T    24. T      25. T    26. F    27. F    28. F   29. T   30. T

31. F      32. T   33. T   34. F    35. F      36. T    37. T    38. T       39. F     40. T 

41. T      42. T    43. T       44. T     45. T       46. T     47. T    48. T     49. T   50. T

 51. T     52. T    53. T    54. T     55. F      56. F     57. T     58. F     59. T     60. T

 61.  F     62. T     63. F     64. F       65. T      66. T     67. T     68. T     69. T    70. F

 71. T       72. T      73. T    74. F     75. F      76. T     77. F     78. T   79. T      80. F 

81. F      82. F     83. T      84. F     85. F     86. T      87. F  88.   T   89. F       90. F 

91. F     92. T      93. T   94. F    95. T     96. T    97. F     98. T     99. T    100. F 


No comments:

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information.

NOTE: We do not take any responsibility of authencity of Information/News/Videos.

INDEX II

Q Bank - Establishment / Personnel Dept. (82) Q Bank - Electrical Engineering (79) Q Bank - OS / Clerk / Typist (71) Q B Engg (P Way & Work) (67) Q BANK - Operating (62) Group 'B' Exam (60) Q Bank - APO ( Asst. Personnel Officer) (57) QUESTION BANK WITH ANSWER (55) Q B Establishment (47) Q Bank - Goods Guards (45) Q Bank - OHE/TRD/PSI (36) Q B - CIVIL ENGINEERING (AEN) (27) Q B - Welfare Inspector (27) Q BANK - C & W ( Carriage & Wagon ) (26) Q Bank - Account (24) Q BANK - LOCO (23) Q BANK Exam - Station Master (23) Q Bank - Commercial (21) Q Bank - AOM (19) Q BANK - Station Master (18) Q Bank - S & T (14) 1. Syllabus (13) Q Bank - D & AR (Discipline and Appeals Rule) (12) Q Bank - Medical (12) Q Bank - Posts (Civil Engineering & P way) Dept (12) 2. Q Bank - Group D To C (11) INDEX (11) QB - ENGINEERING ( MECHANICAL ) (11) Q Bank - LOCO (Diesel) (9) Q Bank - ACM (Assistant Commercial Manager) (9) Q BANK - Jr Engineer ( Diesel Mechanical ) (8) Q BANK - LOCO (AC) (8) Q Bank - Law Assistant (8) Q Bank - AME/AWM (7) Q Bank - Group D To C (6) Q Bank - Stores (5) RRB EXAM (5) NTPC (4) Q Bank - ADSTE / ASTE (4) Q Bank - AEE (4) Q Bank - CLI (4) Q Bank - General Knowledge (4) Q Bank - Publicity Inspector (4) Q Bank - Rajbhasha (राजभाषा) (4) Question & Answer (4) Q Bank - Appointment On Compassionate Ground Exam (3) Q Bank - Commercial Instructor Exam (3) Q Bank - Engineering (Bridge) (3) Q Bank - IT (3) Q Bank - Protocol Inspector (3) Q Bank - RPF Department (3) Short Notes (3) Q BANK - Jr Engineer ( Mechanical ) (2) Q Bank - C & M (2) Q Bank - Carpenter (2) Q Bank - General English (2) Q Bank - Jr Engineer (Tele) (2) Q Bank - Ministerial Staff (2) Q Bank - Track Machine (2) Q Bank -Section Controler (2) Video (2) ABB (1) FAQ (1) GDCE Exam (1) IRMS (Indian Railway Management Service (1) JUNIOR ENGINEER (Non -AC) GRADE - II (1) Minimum Wages Act (1) Project & Planning (1) Q BANK & Answer - C & W ( Carriage & Wagon ) (1) Q BANK - Shunting Master (1) Q Bank - Instructor (1) Q Bank - AMM (1) Q Bank - All Department (1) Q Bank - Ballast Train Checker (1) Q Bank - CCTC (1) Q Bank - Complaints Inspector (1) Q Bank - GK (Computer) (1) Q Bank - Leave Rule (1) Q Bank - Mason (1) Q Bank - Maths (1) Q Bank - NPS (New Pension Scheme) (1) Q Bank - OS / Clerk Typist (1) Q Bank - Pass Rule (1) Q Bank - Planning Inspector (1) Q Bank - Railway (GK) (1) Q Bank - Stenographer (1) Q Bank - Traffic Costing Inspector (1) Question Bank - Technicians of TLAC Group. (1) Short Notes - Establishment (1) Short Notes - Operating / Traffic (1)