LDC Q. PAPER CIVIL ENGINEERING 2 (13 – 10 – 1984)

 Q. 1 – ( a ) Draw the bending moment and shear force diagram for a beam carrying a uniformly distributed load the supports are at a distance of L / 4 from each end L being the length of beam ? 


( b ) Design a double reinforced RCC roof slab for a room of size 16’ x 16’. 

Q. 2 – ( a ) How would you decide the type of bridge and type of foundations for a bridge to cross a nala of 500 feet width. High flood level is 25 feet above average bed level.

( b ) Show with a sketch layout of reinforcement in RCC Box culvert. 

Q. 3 – Write short notes on any four of the following: - 

a) S.F.Curve.

b) Poison’s ratio.

c) Pert Chart.

d) Controlled concrete.

e) Load test on pile.

f) Neoperene bearings. 

Q. 4 – Indicate specification for any four of the following: -

a) Mass c.c. for bridge abutment.

b) Flooring for heavy repair shed.

c) Asphalting of colony roads.

d) Mosaic tile flooring.

e) Wearing course in road surface of a road over bridge.

Q. 5 – Indicate with sketches the method of launching 60 feet Girder spans on a viaduct.

Q. 6 – While carrying out survey for a new railway line, how would you decide the water ways required for a bridge.

Q. 7 – Design a water supply scheme for a station, adopting the following data –

a) Source of water – River flow at a distance of 1 km.

b) Requirement of water – 1 lack gallons per day.

c) Difference in level between water level in river and level to which water is to be pumped – 200 feet.

No comments: