OBJECTIVE –QUESTIONS ON TRD (PART - 1)

OBJECTIVE –QUESTIONS ON TRD (PART - 1 )

1. Expand TRD ----------------------------------------------------------------------------------

2. Maximum distance between two Discharge Rods -----------------------------

3. Discharge Rods should generally be placed at a maximum permissible distance from the work spot. (True/False)

4. Is it compulsory to test the line dead by a slight touch of discharge rod at Resister tube prior to

placement of discharge rod on OHE wires? (Yes/NO)

5. Expand – PTW- --------------------------------------------------------

6.  1 Meter = ----------------------- mm.

7. Broad Gauge of Railway is ---------------------------------  mm.

8. The minimum permissible OHE voltage at SP is  ----------------------KV.

9. Cable size of OHE Discharge rod is --------------------  sq.mm.

10.The safe working distance for 25KV AC OHE is ---------------------.

11. The DJ open caution board comes after the Neutral Section.(True /False).

12. Height of Height Gauge is --------------------

13.  Height Gauge is used at --------------------------

14. The caution board that should be displayed on Height gauge is ----

a) No caution board shall be displayed.     b) Danger Board.

c) Power block Working Limit                  d) Caution Electrified Section.

15.Name the Caution Board for different Elementary Sections?

16. Traffic hauled by Diesel Power may be permitted into the section under Power Block.(True/False).

17. TI/MI is issued by RDSO. (True/False)

18. Discharge Rods is a safety item.(True/False)

19. Fire Extinguisher suitable for an electrical fire/ fire in live electrical equipment?

20. IR value for an OHE elementary section?

21. Track Protection should be done as per G&SR rule No.-------------------------

22. Expand – ACTM- ---------------------------------------------------------------------

23.  1 Tone = -------------------------------- Kg.

24.  Codel Life of a Detonator ----------------------------

25. Which Tool is used to tackle heavy loads & tensile force-

a) Discharge Rod.                         b) Max-Puller     

 c) Grease Gun                           d) Power Hack Saw.

26. The Tool named Pull-Lift is used for?

a) To earth OHE.                                             b) POH of ATD

c) To hold weight of contact wire.                   d) Non of the above.

27. The tool used to make a perfect gripe on OHE wires is-

a) Come along Clamp                                   b) Max-Puller

c) Pull-Lift                                                    d) Rope pulley block

28. In case of 25KVAC system electrical clearance is greater than working clearance.
.(True/False)

29.  The Competency Certificate No. for a OHE Lines man is ---------------------

30.  What is Super Elevation?

a) Length of Super Mast.                         

b) Mast more than 9.5mt length.

c) The uplift of outer rails on curved tracks.

d) Height difference in contact wire at turn-outs.

31. The Caution Board that must be displayed on FOB/ROBs –

a) Caution 25000 volts.

b) DJ opens board

c) Lower Panto

d) Danger Men working.

32. Caution Board applicable at Dead-End OHE termination is –

a) Caution OHE ahead is alive.

b) Restricted Clearance.

c) Electric Engine Stop

d) Unwired Turn-Out.

33.  The section between a TSS and SP is called as ----------------------------.

34. The section between a TSS and SSP is called as ----------------------------

35.  The section between a SSP and SP is called as ----------------------------

36. As per ACTM the section that’s supply is controlled by a CB is called as---------

37. As per ACTM the section that’s supply is controlled by a BM is called as---------

38. The elementary section supply is controlled by a-

a) CB

b) BM

c) Hand operated off load switch.

d) BX

39.  What is shown in mutually contrast colour in a OHE sectioning diagram?

a) Sector

b) Sub-Sector

c) Elementary Section

d) Non of the above.

40. According to ACTM ; fire is classified into --------- categories.

41. Inflammable liquids like Transformer oil is categorized as group ----------- fire.

42. Which schedule maintenance has a periodicity of four years.?

a) AOH

b) IOH

c) POH

d) Non of the above.

43. Which schedule maintenance has a periodicity of twelve months?

a) AOH

b) IOH

c) POH

d) Non of the above

44.  Schedule maintenance Foot Patrolling of a section is done by a Lines Man at an interval of 10 to 15 days.(True/False)

45.  The re-tensioning of un-regulated OHE is done at an interval of --------- years.

46.  Periodicity of Special Check of OHE is –

a) 15 days

b) 45 days

c) 5 years

d)No defined periodicity, it depends upon usage and chance of failure of the Equipment.

47.Oliver –G is used for –

a) Thickness of OHE

b) Sag in OHE

c) Height and Stagger of OHE.

d) Non of the above.

48.Oliver –G is used for current collection Test.(True /False)

49.Oliver –G can be used in Day time only and not in the night.(True/False)

50.Why it is better to use Oliver-G for Current Collection Test.-

a) It can be used in day & night.


b) No work man is required.

c) Indicates exact spark location

e) It is modern and so, is better.


ANSWER


1. Traction Distribution.        2. 1000 mts.                3. False.               4. Yes.

5. Permit to work.                   6. 1000                        7. 1676                  8.19

9. 40                                         10.  2                            11.   True              12.  4.67 mts.

13. Level Crossing.                 14.   b                           15.     Power Block working limit.

16.True                                     17. True                      18.True                  19. DCP

20.  25MΩ                                21.  15.09 (1) b           22.     Alternating Current Traction Manual.

23.  1000                                   24. 7   25. b                 26.  c    27. a         28. False.       

 29.  TR-01   30.c                      31. a                            32.c   33.Sector.     34.Sub-Sector.   


 35.Sub-Sector.                         36.Sector.                    37.Sub-Sector.       38.c   39.c    


 40.4  41.B                                 42. c                            43. a                         44. True      


 45. 2                                        46. d                            47.  d                         48. True         


49. False                                  50. c

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information.

NOTE: We do not take any responsibility of authencity of Information/News/Videos.

INDEX II

Q Bank - Establishment / Personnel Dept. (82) Q Bank - Electrical Engineering (79) Q Bank - OS / Clerk / Typist (71) Q B Engg (P Way & Work) (67) Q BANK - Operating (62) Group 'B' Exam (60) Q Bank - APO ( Asst. Personnel Officer) (57) QUESTION BANK WITH ANSWER (55) Q B Establishment (47) Q Bank - Goods Guards (45) Q Bank - OHE/TRD/PSI (36) Q B - CIVIL ENGINEERING (AEN) (27) Q B - Welfare Inspector (27) Q BANK - C & W ( Carriage & Wagon ) (26) Q Bank - Account (24) Q BANK - LOCO (23) Q BANK Exam - Station Master (23) Q Bank - Commercial (21) Q Bank - AOM (19) Q BANK - Station Master (18) Q Bank - S & T (14) 1. Syllabus (13) Q Bank - D & AR (Discipline and Appeals Rule) (12) Q Bank - Medical (12) Q Bank - Posts (Civil Engineering & P way) Dept (12) 2. Q Bank - Group D To C (11) INDEX (11) QB - ENGINEERING ( MECHANICAL ) (11) Q Bank - LOCO (Diesel) (9) Q Bank - ACM (Assistant Commercial Manager) (9) Q BANK - Jr Engineer ( Diesel Mechanical ) (8) Q BANK - LOCO (AC) (8) Q Bank - Law Assistant (8) Q Bank - AME/AWM (7) Q Bank - Group D To C (6) Q Bank - Stores (5) RRB EXAM (5) NTPC (4) Q Bank - ADSTE / ASTE (4) Q Bank - AEE (4) Q Bank - CLI (4) Q Bank - General Knowledge (4) Q Bank - Publicity Inspector (4) Q Bank - Rajbhasha (राजभाषा) (4) Question & Answer (4) Q Bank - Appointment On Compassionate Ground Exam (3) Q Bank - Commercial Instructor Exam (3) Q Bank - Engineering (Bridge) (3) Q Bank - IT (3) Q Bank - Protocol Inspector (3) Q Bank - RPF Department (3) Short Notes (3) Q BANK - Jr Engineer ( Mechanical ) (2) Q Bank - C & M (2) Q Bank - Carpenter (2) Q Bank - General English (2) Q Bank - Jr Engineer (Tele) (2) Q Bank - Ministerial Staff (2) Q Bank - Track Machine (2) Q Bank -Section Controler (2) Video (2) ABB (1) FAQ (1) GDCE Exam (1) IRMS (Indian Railway Management Service (1) JUNIOR ENGINEER (Non -AC) GRADE - II (1) Minimum Wages Act (1) Project & Planning (1) Q BANK & Answer - C & W ( Carriage & Wagon ) (1) Q BANK - Shunting Master (1) Q Bank - Instructor (1) Q Bank - AMM (1) Q Bank - All Department (1) Q Bank - Ballast Train Checker (1) Q Bank - CCTC (1) Q Bank - Complaints Inspector (1) Q Bank - GK (Computer) (1) Q Bank - Leave Rule (1) Q Bank - Mason (1) Q Bank - Maths (1) Q Bank - NPS (New Pension Scheme) (1) Q Bank - OS / Clerk Typist (1) Q Bank - Pass Rule (1) Q Bank - Planning Inspector (1) Q Bank - Railway (GK) (1) Q Bank - Stenographer (1) Q Bank - Traffic Costing Inspector (1) Question Bank - Technicians of TLAC Group. (1) Short Notes - Establishment (1) Short Notes - Operating / Traffic (1)